We have all but finished applying the durabak to the flooring and top cap, and we still have 2 gal. left..so we are looking at doing the interior side walls, some other spots and we are sure that there are some sections of the floor that will need another coat. I have to say that I am impressed with the tenacity of the product and how tough it seems to this point. Here da pics:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment