Long time since I updated the blog, we have installed the seat boxes and started painting. Going back with Brightsides, blu glo white for the top coat...and we noticed/thought that the white would be too bright in the interior..specifically for the floor and sidewalls..so we mixed some Ocean blue at a 5-1 ratio to lighten the blue. Before any of the top got applied we did a no sand wash and then applied the epoxy coat 2part epoxy primer. The first two pics are of the primer coat, and the next two are the first coat of topside.
Sunday, April 25, 2010
Seat boxes installed and paint
Long time since I updated the blog, we have installed the seat boxes and started painting. Going back with Brightsides, blu glo white for the top coat...and we noticed/thought that the white would be too bright in the interior..specifically for the floor and sidewalls..so we mixed some Ocean blue at a 5-1 ratio to lighten the blue. Before any of the top got applied we did a no sand wash and then applied the epoxy coat 2part epoxy primer. The first two pics are of the primer coat, and the next two are the first coat of topside.
Sunday, September 13, 2009
Seats and Floor





The seat boxes have been wrapped in 6oz cloth, the seams were all wrapped in 8oz tape and we also applied a thin layer of epoxy+cabosil to make the fairing a little easier. I highly recommend that edges be routed if you plan on turning the corner with fiberglass, it made a huge difference between getting a great wet-out and having air pockets and bad adhesion. The next step on these is to sand them and them secure them to the floor.
Floor:
We added the 1/2" pieces of plywood to the back section of the deck, screwed and glued (epoxy+cabosil) them to the first floor section and then filled in the edges with a cabosil fillet. The aftmost section is t-shaped which provides for a channel on both the port and starboard sides, as well as a nice channel in the very back for the water to break to the scuppers. We also added some pyramid shaped blocks to the corners to help direct the water from the corners, a problem that was annoying especially when dirt settled in those areas. The flooring was then taped down with the 8oz tape and the blocks were also glassed. This section will next receive the same 24oz woven that the previous section got and we should have a nice, sealed, non-slippery deck. We have already removed all of the spongy spots, but the extra glass will seal and strengthen it.
Due to the constant hatch failures we have opted to make the bilge access hatch out of the same deck material. The cutout will get wrapped in 6oz to seal it and then sandwiched with 24oz to stiffen it.
Monday, August 24, 2009
Seat Boxes
The hatch holes, speakers, and radio have all been cut. The inside of the box compartments have been fiber glassed and all of the edges have been routed to make the tape transition smoother.
Sunday, August 09, 2009
Durabak Removal - Interior Do-Over
- removal of ALL of the Durabak non-skid from the interior (floor, side walls, gunnels, etc.)
- adding a sheet of 1/2" ply to the aft flooring to stiffen it up,
- changing the hatch configuration because of failures (heavy feet have busted two hatches),
- constructing some seat boxes to mount the chairs to and to provide dry storage and radio housing and we are reworking the side wall covers, which will be integrated into the seat boxes. I will post pictures of the build out and the finished products.
Not to beat a product, but I would warn anyone thinking about using this on the interior of your boat, to think long and hard. The drawbacks that we have encountered have included: - adhesion - the consistency of the product's adhesion has been extremely lacking. It has adhered very well in some areas, not so well in others and has simply peeled and flaked off since it was applied. This could, could be due to surface prep., although I doubt it, and think it is more related to surface structure. Painted surfaces have been more successful, epoxy fiberglass has proven to cause failure.
- application - once you crack a can of durabak, be prepared to apply ALL of it right then. The pot life on the product requires you to apply it once it is opened.
- dirt attraction - it is hard to clean. blood stains it, rust stains it, hell leaves have stained it.
- color matching - do not count on getting the same product from the company if you order multiple batches. The first order came as expected (gray) the second order came 1 part dark gray, one part white...they instructed us to mix and match....which would be okay if we were not trying to match to previously applied top-sided material...not to mention the pot life issue I already talked about.
- removal - if you do think that you will modify an area that is a candidate for this non-skid...IF it does adhere it is a B*tch to remove...Stripease will break it down, but plan on spending some time with a wire brush extension in a grinder.
There are some positives to the product, where it has correctly adhered it is a hell of a non-skid...you will not slip on it...if you do, break out the peroxide and neosporin.
Wednesday, October 24, 2007
October Fishing Trip with Dad
Dad pulled in a couple, and we missed about as many as we caught...but it was great to go fishing with Dad and not be stuck in the inlet/creeks targeting flounder (no offense to the flounder).
The boat ran like champ, we only had a minor issue with the batteries on day 1, but after a quick charge they were good to go.
Here is a pic of the formula pre-wash down.
Sunday, September 30, 2007
Windshield Mounted
Thursday, August 30, 2007
Sunday, August 12, 2007
Bow Rail Install
The heat has been preventing any work during the week (100+ temperatures), and it was hot on saturday...We did decide to take on the re-install of the bow rail...which was over 24" tall when we bought the boat (notice the original height):

Then, we called it a day and watched the Panther's beat the NY Football Giants in our first preseason game...the new zone blocking scheme looked great...
Sunday, July 15, 2007
Dash Modification

This weekend I made the modifcations to the Instrument Panel that were required for us to re-mount the windshield in the original position (the instrument panel we made sat too high with the electronics mounted, for the angle of the windshield). We had thought about raising the dash (where the windshield will sit) but opted to bite the bullet and cut the instrument panel down, since we were not really using the upper portion for anything other than mounting the GPS and VHF to.
So, I cut the dash about 1/4 inch below the cupholder and ripped out the original piece. Then dug the grinder out of storage and started prepping the area for some cabosil bedding. Next, I reassembled the driver's side windshield to ensure that I did not make the same mistake again and the angles worked. So I cut out a piece of luon to fit, mixed up some epoxy + cab, cut some fabric and put it in...The next day and grinded on that setup, and then attached some 1/4 round to the end to smooth it out and then did the cab, fabric & glass thing again. I actually think this will turn out better, although it sucks to grind off top coat...but that was easy enough to put on. Here is the single pic I took w/ my phone.
Saturday, June 30, 2007
Details...Small Details
A relatively slow working day, we hooked up the outriggers, remounted the downriggers, added two new rod holders, replaced the bimini's plastic hardware with stainless, fit the driver side gunnel enclosure, mounted the GPS antenna, finished the install of the cuddy cover, OH Shit handle, installed some trim work and reworked the wench stand on the front of the trailer. We have abandoned the leaning post setup in favor of a swingback seat that has a livewell/cooler/storage in it. This made for a better setup with more room and comfort. We have some ends to tie up prior to the launch, but nothing is a show stopper. Team Hatley is slightly anxious to go fishing. Here are some pics...we are looking at a tower that is for sale on www.thehulltruth.com and if we can acquire that and get the windshield worked out we will be in serious bidnezz.
Ready to fish:

Officially Legal:

Pic of the new cuddy cover and the instrument panel (candidate for change):

Pic of the back...
Monday, June 25, 2007
More Progress, closing in on the Saltwater Launch
Monday, June 11, 2007
Last Sea Trial

Phil was able to get the bottom completely painted over the last few weeks, through a painful series of blocking, lifting, sanding and painting the boat while it was still on the trailer...primarily the issues were where the bunks are located. But it is done.

This past weekend, we reinstalled the seats, hatches, bilge pumps, new prime balls, gunnel covers, and some additional hardware...then we went back to the lake and ran the boat pretty hard for an hour and a half...it was the best of the trials, no issues, and no leaks (around the scuppers)...all said it was a great trip.

I also started prepping the cuddy for some work...I would have preferred that Formula NOT have glued carpet into the interior of the boat back in '72...that was not fun to sand off, but it got done and has been primed. Hopefully, will be able to get back and have that done soon...next step will be to get the windshield going. But she will probably get salty before she gets glasses.
Sunday, May 13, 2007
Bottom Paint
Monday, April 30, 2007
Rub Rail, Cables, and Floor-take two

The wife and new addition split for Spartanburg this weekend and allowed some substantial time to be spent on the project. Friday night was spent taping off and cutting out the patterns that we wanted on the recently addressed floor. Since the last update, Phil spent alot of time, sandblasting the original Durabak off, epoxy painting the floor, priming it, and then applying generous coats of top coat paint (3 total). We have concluded that we caused the durabak to fail b/c we did not spend enough time in the prep work...so this time sand, vac, tac cloth, acetone wipe, solvent cleaner wipe and then apply the paint - each time...it appears to have resulted in better adhesion. After the sanding, we applied the new Durabak on Saturday morning.
While that was setting up, we installed the rub rail...per the install instructions, it was pretty easy to do but there are alot of screws in the install.

After the rub rail was finished, I sported the tyvex suit, respirator and goggles and started sandblasting the bottom in preparation for the bottom paint - mostly to get the barnacles and old paint off. Phil got back to putting the engines back in order and came up with a method to get the hose covers inside the engine covers...looks better than before and should give us a nice seal:
Saturday, March 24, 2007
Setback with the flooring
So, after some arguing (more reluctance and disgust) we pulled the seats, leaning post and hatches and began the removal of the durabak from the floor. This has been loads of fun, sandblasting (sandblasting pad on the grinders), sanding and scraping the durabak off, re-epoxy painting the floor....
The best we can figure is that the primer we used (which was suggested by Durabak as sufficient in the application) either did not bond correctly to the floor or the D-bak did not bond to the primer...in some areas we had great adhesion, in others, it was very $$ to have it pull away as it has....
The plan now is continue stripping, epoxy paint, prime and paint like we did the top coat (but with 4-5 coats of topper) and then put down strips of d-bak in the high-traffic areas. We think this will look a lot better too, so the entire inside of the boat is not grey.
We have had no problems with the d-bak in the areas that we applied it to finished top coat, only to those areas that we only primed. Damn that was expensive....
Saturday, November 11, 2006
Durabak #2
Tuesday, October 31, 2006
Top Side and Durabak
The vertical roll-n-tip method left us with a great result, especially for two guys doing a project boat...
The last thing that we did was to apply the first of two coats of durabak to the flooring and to choice spots on the top, side caps and dash. This stuff is thick, and I recommend thinning it very slightly (product allows upto 15% but we did about 5%). Thinning it, allowed the stuff to be more workable, we noticed that as the pot life expired, the roller would tend to "pull strands" as you went and these were getting onto spots that we did not want, so a little xylene and it was gone. One other recommendation is to pull the tape while the durabak is still pretty wet (5-10 minutes). Here are the pics:
(that is a reflection of a barrel, 10ft away, on the side)
Before we durabak'd it:
After:
Monday, August 28, 2006
1st coat of Primer
Acetone wipe down, then thinner solvent wipe down and primer. We actually rolled and tipped the primer, to hopefully save ourselves a little sanding time later.
Here are the pics (b4 and afters):
the spotty bottom paint still looks great! : )
we still have some sanding to do.