Friday, July 29, 2005

2nd Flooring Section and Gas Tank Foamed in

We set the tank today, and fitted up the fill and vent hoses under the raised platform and wired the sending unit. After that we foamed in around the tank with some 4lb foam, which does not expand nearly as much as the 2lb foam, but does setup a little harder and provides for more support.

I did not get a pic prior to laying down the 2nd section of flooring, but here is a shot of the back bulkhead and foamed in gas tank:


We also cut another piece of the 1/2" to lay in the front section to provide us with a little more a$$ to mount the pedestal seats to.

And here is a shot of the dry fit lower flooring:

No comments: