Sunday, July 24, 2005

Flooring Prep

this weekend we shot the gas tank with a coat of army-green aluminum paint for protection. We also built the platform for the raised section of flooring and cut the plywood for that section of the floor.
Next trip should include foaming the tank in, shimming out the platform frame and the remainder of the floor, as well as adding the backing for the sections that will be supporting our seats.

Pic of the gas tank bay, with strips of foam covering the wooden runners and a coat of bilge paint down the center:


pic of the cuddy with both supports in place:


pic of the tank in the cradle ready for some foam:


pic of the platform frame - which we have to shim level and then cabosil and glass down:


pic of the flooring getting dry fit:

No comments: